Planned Sinclair Copper Mine activities include the immediate processing and commercialization of the above-ground copper oxide ore and the continued confirmation drilling to further confirm the inferred 31 million metric tons of copper sulphides below ground.

Planned Sinclair Copper Mine activities include the immediate processing and commercialization of the above-ground copper oxide ore and the continued confirmation drilling to further confirm the inferred 31 million metric tons of copper sulphides below ground.

CURRENT STAGE

CURRENT STAGE

Licensed. Stockpiled. Restart Ready.


The Sinclair Copper Mine is fully licensed, fully compliant, and operating under recently renewed mining and environmental approvals.


The project has transitioned from evaluation to structured restart execution phase. 

Approximately 200,000 metric tons of copper oxide ore are already stockpiled on site and ready for immediate crushing and processing. These stockpiles alone represent near-term production capacity.


Beyond this, Mountain One contains an estimated five to six years of additional copper oxide material accessible for blasting, crushing, screening, and processing — ensuring operational continuity from the same mineralized system that generated the existing stockpiles.


With regulatory approvals secured and material already at surface, the focus is now on processing activation and revenue generation.

Licensed. Stockpiled. Restart Ready.

The Sinclair Copper Mine is fully licensed, fully compliant, and operating under recently renewed mining and environmental approvals.

The project has transitioned from evaluation to structured restart execution phase. 

Approximately 200,000 metric tons of copper oxide ore are already stockpiled on site and ready for immediate crushing and processing. These stockpiles alone represent near-term production capacity.

Beyond this, Mountain One contains an estimated five to six years of additional copper oxide material accessible for blasting, crushing, screening, and processing — ensuring operational continuity from the same mineralized system that generated the existing stockpiles.

With regulatory approvals secured and material already at surface, the focus is now on processing activation and revenue generation.

NEXT STEPS

INDICATIVE NEXT STEPS

INDICATIVE NEXT STEPS

PHASE 1: PROCESSING PLANT DEPLOYMENT & PRODUCTION ACTIVATION

Deploy, commission, and operate a full on-site processing plant circuit, including crushing, screening, concentration systems, and supporting heavy equipment (excavators, loaders, and power infrastructure).


Initial operations will focus on processing the existing above-ground copper oxide stockpiles currently on site — enabling near-term production and concentrate sales to our established offtake clients.


Controlled blasting and extraction will continue at Mountain One to sustain feedstock supply and maintain production continuity.

PHASE 1: PROCESSING PLANT DEPLOYMENT & PRODUCTION ACTIVATION

Deploy, commission, and operate a full on-site processing plant circuit, including crushing, screening, concentration systems, and supporting heavy equipment (excavators, loaders, and power infrastructure).


Initial operations will focus on processing the existing above-ground copper oxide stockpiles currently on site — enabling near-term production and concentrate sales to our established offtake clients.


Controlled blasting and extraction will continue at Mountain One to sustain feedstock supply and maintain production continuity.

PHASE 2: Expansion Across Mineralized Zones

Following stabilization of Phase 1 operations, mining activities will expand to additional mineralized zones within the Sinclair license area (Mountains Two, Three, and Four), supporting increased throughput and extended mine life.

PHASE 2: Expansion Across Mineralized Zones

Following stabilization of Phase 1 operations, mining activities will expand to additional mineralized zones within the Sinclair license area (Mountains Two, Three, and Four), supporting increased throughput and extended mine life.

PHASE 3: Sulphide Resource Development

Parallel to the copper oxide production, the Company will advance confirmation drilling and technical development of the 31+ million metric tons of copper sulphide mineralization identified below ground, positioning the project for longer-term scale and potential processing upgrades.

PHASE 3: Sulphide Resource Development

Parallel to the copper oxide production, the Company will advance confirmation drilling and technical development of the 31+ million metric tons of copper sulphide mineralization identified below ground, positioning the project for longer-term scale and potential processing upgrades.

REquest SINQ OFFER

Submit your details below to request access to the Institutional Overview and related financing materials

Progression of the Project, and whether any of the steps outlined above occur at all, is subject to technical results, regulatory approvals, funding availability, and market conditions. There can be no assurance that exploration activities will proceed as described or result in the delineation of mineral resources or mineral reserves.

Request SinQ OFFEr

To request access to the Institutional Overview and related financing materials.

This website is for informational purposes only and is intended for institutional and professional investors. Nothing on this site constitutes an offer to sell or a solicitation of an offer to buy any security or financial instrument.

This website is for informational purposes only and is intended for institutional and professional investors. Nothing on this site constitutes an offer to sell or a solicitation of an offer to buy any security or financial instrument.

REQUEST SINQ OFFER

To request access to the Institutional Overview and related financing materials.

Technical information on this website relating to the Sinclair Copper Mine Project is derived from, and must be read in conjunction with, the independent NI 43-101 Technical Report prepared by Caracle Creek Chile SpA.

Legal and regulatory advisory services are provided by LegalNode.

Digital administration infrastructure supporting the offering is provided by Brickken.

© 2026 SINQ. A wholly owned subsidiary of Starseed Global FZCO. All rights reserved.

Logo Image

Technical information on this website relating to the Sinclair Copper Mine Project is derived from, and must be read in conjunction with, the independent NI 43-101 Technical Report prepared by Caracle Creek Chile SpA.

Legal and regulatory advisory services are provided by LegalNode.

Digital administration infrastructure supporting the offering is provided by Brickken.

© 2026 SINQ. A wholly owned subsidiary of Starseed Global FZCO. All rights reserved.

Logo Image

Technical information on this website relating to the Sinclair Copper Mine Project is derived from, and must be read in conjunction with, the independent NI 43-101 Technical Report prepared by Caracle Creek Chile SpA.

Legal and regulatory advisory services are provided by LegalNode.

Digital administration infrastructure supporting the offering is provided by Brickken.

© 2026 SINQ. A wholly owned subsidiary of Starseed Global FZCO. All rights reserved.

Logo Image